Instrumentation

First batch of ITK Pixel prototype modules sent for testing

This first batch of RD53A triplet modules fully assembled and characterized at IFAE by the ATLAS pixels group has recently left IFAE to SLAC (United States) for ITk loading testing

A first batch of ITK Pixel prototype modules has recently left IFAE to SLAC (United States) for ITk loading testing.

This first batch contains four RD53A triplet modules fully assembled and characterized at IFAE by the ATLAS pixels group. Juan I. Carloto, Eric Peregrina, Jaume Tóvar and Pablo Fernández have contributed to this production.

A second batch of three RD53A modules has been already assembled, and it is now under electrical testing at IFAE facilities, before being sent to SLAC by the beginning of June.

Latest Group News

New Member

New Member in the ATLAS group

September 7, 2022

Gabriel Corrêa has just joined the ATLAS group as a PhD student.

Instrumentation

The ALTIROC2 device assembled at IFAE tested for the first time with a particle beam

July 27, 2022

An ALTIROC2 device assembled at IFAE was tested for the first time with a particle beam

New results

New ATLAS results for ICHEP 2022

July 13, 2022

Members of the IFAE-ATLAS team have played a leading role in two of the 31 new results released by ATLAS at ICHEP 2022. The corresponding publications will be submitted to the journal soon.