Instrumentation
First batch of ITK Pixel prototype modules sent for testing
June 29, 2022
Collider Physics GroupThis first batch of RD53A triplet modules fully assembled and characterized at IFAE by the ATLAS pixels group has recently left IFAE to SLAC (United States) for ITk loading testing
A first batch of ITK Pixel prototype modules has recently left IFAE to SLAC (United States) for ITk loading testing.
This first batch contains four RD53A triplet modules fully assembled and characterized at IFAE by the ATLAS pixels group. Juan I. Carloto, Eric Peregrina, Jaume Tóvar and Pablo Fernández have contributed to this production.
A second batch of three RD53A modules has been already assembled, and it is now under electrical testing at IFAE facilities, before being sent to SLAC by the beginning of June.
Instrumentation
First Pre-production Modules for the ATLAS upgrades for the LH-LHC Assembled at IFAE
February 21, 2024
The first pre-production triplet module for the ATLAS upgrades for the LH-LHC has been assembled this week at IFAE. The IFAE ATLAS Pixels group is building modules for the innermost pixel layer of the tracking detector (ITk) and the new high granularity timing detector (HGTD).